Detector commissioning – MFT

OBSOLETE: This page is now obsolete, new location at https://alice-flp.docs.cern.ch/Archive/LabSetupMFT/

Introduction

The MFT commissioning setup is located in building 581.
It consists of 3 Run 2 HLT nodes: alimftcom1, alimftcom2 and alimftcom3.
The O2/FLP contact person is Roberto Divia.

Hardware setup

TBD.

Knowledge Base